Performance (kw)
DOWNLOAD
Datasheet
Download
- Placing boom 60/55, 6 sections, pipeline diameter 125 mm, “RRZ” folding
- 4th, 5th ,6th boom sections made of light and resistant CIFA
- CARBOTECH composite material. 1st,2nd and 3rd sections made of high strength
- Assembly on 4 or 5 axles
- Fully hydraulic outrigger controls on both sides of the
- Front “X” style diagonal outriggers with double telescopic opening and swing-out rear
- “Load Sensing” proportional boom
- Concrete flow rate
- Safety device on opening of the concrete discharge hatch and hopper grid
- 2 Proportional radio control with two boom movement speed, synthetizer for automatic frequency search, 8 position joystick and concrete flow rate regulator. 20 mt cable
- Remote controlled electric vibrator placed on the concrete hopper
- Centralized lubrication system for pumping
- Hard plastic outrigger support plates with
- Rear light on hopper and stabilization
- Level readers for stabilization
- Accessories for cleaning and pipe
- Double thickness concrete pipes, in high resistant steel - CIFA Long
- Life
- Long life wear plate and cutting ring with hard carbide
- Medium pressure water pump (50l/
- Fiberglass hopper covering